Standard ALB problems
Problem ALB ? ? ? ? ? ? | ? ? ? ? ? ? | ? ]  ((M)GALBP)
Name: (Most) General Assembly Line Balancing Problem
Description: In the literature, all problem types which generalize or remove some assumptions of SALBP are called generalized assembly line balancing problems (GAL...
Problem ALB link  inc  cum  fix  excl  type  min  max |  | m ]  (ARALBP-1)
Name: Assignment Restricted Assembly Line Balancing Problem
Description: This problem extends SALBP-1 by considering all types of assignment restrictions:
  • Task restrictions: linked and incompatible task pairs
Problem ALB pasubgraph |  | m ]  (ASALBP)
Name: Alternative Subgraphs Assembly Line Balancing Problem
Description: The classic assembly line balancing problem basically consist in assigning a set of tasks to a group of workstations while maintaining the task´s prec...
Problem CS  |  ]  (BCS)
Name: Basic car sequencing problem
Description: Instead of a detailed scheduling of work content, car sequencing considers and controls the succession of work intensive product options (e.g., sunroo...
Problem ALB  | resmax | Co ]  (CALBP-W)
Name: Cost-oriented assembly line balancing problem
Description: The assembly line balancing problem CALBP-W is relevant for straight single product assembly lines where only precedence constraints between tasks are...
Problem ALB tsto |  | Co ]  (CoStoALBP)
Name: Cost-oriented stochastic assembly line balancing problem
Description: ...
Problem ALB pa | equip | Co ]  (EDP)
Name: Equipment Design Problem
Description: This line balancing problem consists of minimizing total cost of simultaneously choosing equipments for stations and assigning tasks to these station-...
Problem ALB mix |  | ? ]  (MMALBP)
Name: Mixed Model Assembly Line Balancing Problem
Description: Mixed model assembly lines produce several models of a basic product in an intermixed sequence. The mixed model assembly balancing problem (MALBP)<...
Problem MM ο ο ο ο ο ο | ο ο ο ο ο | ο ]  (MMSP-W)
Name: Mixed-Model Sequencing Problem with Workload minimization
Description: MMSP-W is the problem of sequencing mixed-model assembly lines in case of fixed rate launching and closed stations. The problem consists of finding an...
Problem LS O |  ]  (ORV)
Name: Output Rate Variation Problem
Description: The ORV is mixed-model assembly sequencing approach that aims at evenly smoothing the material consumption over time, so that a just-in-time supply of...
Problem ALB mult | pline | m ]  (PALBP)
Name: Parallel Assembly Line Balancing Problem
Description: PALBP considers a production system which consists of a number of parallel assembly lines. On each line a certain product is manufactured observing a ...
Problem LS P |  ]  (PRV)
Name: Product Rate Variation Problem
Description: The PRV is a mixed-model assembly sequencing approach that (indirectly) aims at evenly smoothing the material consumption over time, so that a just-in...
Problem ALB  |  |  ]  (SALBP)
Name: Simple Assembly Line Balancing Problem
Description: The simple assembly line balancing problem (SALBP) is relevant for straight single product assembly lines where only precedence constraints between ta...
Problem ALB  |  | m ]  (SALBP-1)
Name: Simple Assembly Line Balancing Problem 1
Description: The simple assembly line balancing problem (SALBP) is relevant for straight single product assembly lines where only precedence constraints bet...
Problem ALB  |  | c ]  (SALBP-2)
Name: Simple Assembly Line Balancing Problem 2
Description: The simple assembly line balancing problem (SALBP) is relevant for straight single product assembly lines where only precedence constraints bet...
Problem ALB Δtind |  | m ]  (SDALBP-1)
Name: Sequence-Dependent Assembly Line Balancing Problem Type 1
Description: The sequence-dependent assembly line balancing problem (SDALBP) is an extension of the standard simple assembly line balancing problem (SALBP) ...
Problem ALB Δtdir |  | m ]  (SUALBSP)
Name: Setup Assembly Line Balancing and Scheduling Problem
Description: Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the products to be assembled among th...
Problem ALB  | u |  ]  (UALBP)
Name: U-line Assembly Line Balancing Problem
Description: The U-line balancing problem (UALBP) considers the case of U-shaped (single product) assembly lines, where stations are arranged within a narro...
Problem ALB inc  fix  type  ch | pwork | m ]  (VWALBP-1)
Name: Assembly line balancing problem with variable workplaces
Description: This problem considers the assembly of large products like cars and machines where parallel workplaces (workers) simultaneously perform different task...
Standard Problems - Navigator
(M)GALBP
ARALBP-1
ASALBP
BCS
CALBP-W
CoStoALBP
EDP
MMALBP
MMSP-W
ORV
PALBP
PRV
SALBP
SALBP-1
SALBP-2
SDALBP-1
SUALBSP
UALBP
VWALBP-1


IP